Introduction
You need to perform routine maintenance on project operations and output O&M reports. For details, see Table 1.
After the instruction stream cloud phone is deployed for the first time, you are advised to perform an inspection immediately.
No. |
Item |
Recommended O&M Period |
Result |
Remarks |
|---|---|---|---|---|
1 |
Changing the IP address |
When changing the network |
||
2 |
Changing the port number |
When changing the Docker port or server port |
||
3 |
Viewing the server status |
Once a day |
||
4 |
Viewing the container status |
Once a week |
Parent topic: Routine O&M