我要评分
获取效率
正确性
完整性
易理解

Inspection Items and Periods

Generate a report based on the inspection operations, as shown in Table 1.

After the instruction stream cloud phone is deployed for the first time, you are advised to perform an inspection immediately.

Table 1 Instruction stream cloud phone inspection report

Category

Item

Recommended Period

Result

Remarks

Server configuration

Hardware configuration

Before the instruction stream cloud phone is deployed

     

Server indicators, such as the temperature, CPU usage, and memory usage

Before the instruction stream cloud phone is deployed

     

Software configuration

Software package verification

Before the instruction stream cloud phone is deployed

     

Alarm check

Server alarms

After a service fault occurs

     

Operating environment

Status of the Kbox operating environment and Docker service

Before running the instruction stream cloud phone

     

Instruction stream cloud phone status

Container

Before or during the running of the instruction stream cloud phone

     

Container resource consumption

Before or during the running of the instruction stream cloud phone